Starting from a teardown or an empty infill lot
Nearly every custom home in Montrose starts with something already on the lot, usually a cottage from the 1920s to 1940s that has reached the end of its economic life or a small house that a previous owner already gutted. Before demolition we look at whether anything on the site is worth saving, from a mature live oak that shades the yard to a detached garage that could stay. Then the teardown is planned like a construction phase: utility disconnects, a demolition permit, a look at whether the old house holds materials that need careful removal, and a haul-off route that works on a block where the trucks cannot turn around.
A vacant infill lot skips the demolition but not the site work. Old foundations, buried piers, and abandoned sewer lines from the house that used to be there are common under Montrose lots, and they have to come out or be accounted for before a new foundation is designed. We also confirm the lot dimensions against the survey, because platted widths and fence lines on these blocks do not always agree. Close neighbors on both sides mean construction fencing, a staging plan for materials, and a conversation about hours and parking before the first day of work.











