Roof, kitchen, or fire feature: which gets built in year one?
When the whole backyard plan is bigger than one season's budget, the order matters. The roof structure comes first in most Memorial plans, because it needs a permit, an engineer, and footings, and everything else attaches to it or sits under it. The outdoor kitchen usually follows, since its gas and electrical runs can be stubbed during the cover's construction. A fire feature and the hardscape around it can come last without disturbing the earlier work. Building in the wrong order means cutting into a finished patio to run a gas line you could have run at the start.
The way to phase without regret is to design the whole yard once and build it in pieces. That means a master plan with every structure, utility, and drain drawn, then a free itemized quote that separates the phases so you know what each one costs on its own. On a large Memorial lot the plan also decides which trees frame which spaces, and that is worth settling before any concrete is poured. Clients who come to us after phase one was built without a plan often end up paying to redo work that a drawing would have prevented.