Building a custom home in Memorial, TX usually means the lot came first. The area's steady wave of new custom construction is largely teardown-rebuild: owners who love the large wooded lot and the neighborhood but have outgrown what a 1950s–70s ranch can reasonably become. We manage that full arc — evaluating the site, coordinating demolition, design, and engineering, and building the new home under one contract with a single accountable team.

Serving Memorial, TX

Custom Homes & New Construction for Memorial Homes

Building a custom home in Memorial, TX usually means the lot came first. The area's steady wave of new custom construction is largely teardown-rebuild: owners who love the large wooded lot and the neighborhood but have outgrown what a 1950s–70s ranch can reasonably become. We manage that full arc — evaluating the site, coordinating demolition, design, and engineering, and building the new home under one contract with a single accountable team.

Memorial builds carry expectations to match the setting, and our process is built for that scrutiny: transparent line-item budgeting before the slab is poured, selections priced as decisions are made, and weekly reporting you never have to chase. Where the lot sits in the Memorial Villages — Hunters Creek, Piney Point, or Bunker Hill — we plan for their independent and notably strict permitting from the first conversation; elsewhere, permits run through the City of Houston.

What's Included

  • Lot evaluation and design coordination
  • Engineering, surveys, and permitting
  • Foundation-to-finish construction management
  • Energy-efficient systems and envelope
  • Premium interior and exterior finish selections
Custom Homes & New Construction Guide

Planning Custom Homes & New Construction in Memorial What to Decide First.

What the lot tells you before the old house comes down

Most custom homes in Memorial replace a ranch house on a lot the owner already loves, so the site evaluation starts with what is there. We look at the trees you want to keep, where the existing utilities enter, how the lot drains, and what the survey says about setbacks and easements. Older Memorial lots sometimes carry surprises, such as an easement that was never an issue for a one-story ranch but limits where a larger house can go. Sorting those out before the architect draws a plan avoids redesigning to fit a constraint that was there all along.

The demolition is a planned event, not a bulldozer day. Utilities are disconnected and capped in coordination with the providers, trees are fenced off with protection zones so equipment stays off their roots, and the old slab is removed rather than left under the new one. Any material worth saving, like old brick or hardwood, is set aside if you want it in the new house. What comes after is a bare site graded for the new foundation, and the condition of that site is the first thing the engineer will need to see.

Village plan review, deed restrictions, and the order to clear them

A new house in Memorial goes through more review than a new house in most of Houston. The permit itself comes from the City of Houston for most addresses, or from the Memorial Villages for lots in Hunters Creek, Piney Point, and Bunker Hill, where the process is notably strict and a new home is the largest thing they review. Many neighborhoods also carry deed restrictions with an architectural committee that has to approve the exterior before the permit is filed. We sequence the submittals so each one builds on the last rather than forcing changes back through the drawings.

The practical effect is that design decisions have to be made earlier than clients expect. Exterior materials, roof form, height, and the position of the house on the lot are what the reviewers care about, and those are locked in before the permit set is complete. Interior selections can wait. We tell clients building in the Villages to expect the review to take longer than it would elsewhere and to treat that as part of the schedule rather than a delay. Drawings that arrive complete and clear go through faster than drawings that raise questions.

Slab design when the trees are staying

A custom home on a wooded Memorial lot sits on expansive clay that has been shaded and drained by tree roots for decades, and the foundation is designed for that specific ground. A geotechnical report tells the engineer what the soil does when wet and dry, and the foundation follows. On most of these lots that means a slab on drilled piers or a stiffened post-tension slab, and sometimes a combination when part of the house sits closer to large trees than the rest. The choice is the engineer's call based on the report, and we do not skip the report to save time.

Keeping trees changes the design in a second way. Piers cannot be drilled through major roots, so the pier layout is drawn around the trees rather than on a neat grid, and the grade beams that span between piers may be deeper as a result. Excavation is done by hand near protected trees. It is slower and it costs more than clearing the lot, and it is the reason many Memorial owners chose to build on this lot instead of somewhere else. The mature canopy is worth the extra engineering, and it is usually why the lot was worth keeping.

How much of the envelope budget should go to wind and water?

A house in west Houston will see a hurricane at some point, and the structure is the part you cannot upgrade later. Framing connections rated for the wind load, continuous load paths from roof to foundation, a roof deck sealed against water intrusion, and windows and doors rated for the exposure are decisions made at the drawing stage. They cost more than the minimum and they are invisible when the house is finished. Our advice is to spend here before spending on finishes, because the finishes are only as safe as the shell around them.

Water management is the quieter half. Flashing at every opening, a drainage plane behind the brick, a roof design that does not trap water in dead valleys, and site grading that carries runoff away from the slab are what keep a Gulf Coast house dry through years of heavy rain. On a lot with heavy canopy, gutters are sized and guarded for leaf load. We detail these on the drawings and inspect them before they are covered, because a house that is built tight in this climate is the one that still looks new after a decade of summers.

What the calendar honestly looks like from demolition to move-in

A teardown and rebuild in Memorial is a long project, and the calendar has phases that do not overlap. Design and engineering come first and take a number of months, especially when a Village review or a deed restriction committee is involved. Demolition and site work follow, then the foundation, which needs its cure time before framing starts. Framing and dry-in, mechanical rough-ins and inspections, insulation, drywall, and finishes each take their turn. Most projects run many months to over a year, and we would rather say that at the start than promise a date that depends on everything going right.

Selections are what most often stretch the schedule, so we work them in order of lead time. Windows, doors, roofing, and brick are chosen early because they are needed early. Cabinetry and stone are chosen before framing is done so they are ready when the house is. Allowances for items not yet selected are set realistically and tracked as line items, and any change is priced before it is made. Weekly reporting keeps you current on where the build is against the plan. Hurricane season gets a place on the calendar too, since roofing and dry-in are scheduled to close the house before the worst of it.

Local FAQs

Custom Homes & New Construction in Memorial, TX.

Answers to common questions from Memorial homeowners planning custom homes & new construction projects.

Yes — that's the most common way custom homes happen in Memorial, and we manage the entire sequence: demolition, utility coordination, site preparation, and the new build. Because one team owns every phase, nothing falls into the gap between a demo contractor, a designer, and a builder.

Beyond size: site and foundation conditions, demolition where a teardown is involved, roof and structural complexity, and — the largest variable by far — your finish selections. We price your actual plans on your actual lot and deliver a free line-item budget you can adjust before construction starts, rather than quoting a per-square-foot number that can't survive contact with reality.

We do, as part of the single contract. That includes the demolition itself and the full permitting picture for your address — City of Houston for most of Memorial, or the independent and famously careful processes of Hunters Creek, Piney Point, and Bunker Hill if your lot sits in the Villages. You have one point of accountability throughout.

From demolition through move-in, most projects run many months to a year or more depending on the home's size, the site, and permitting timelines — Village reviews deserve schedule respect. We build those realities into the plan up front and report progress weekly, so the timeline is something you watch happen rather than wonder about.

Most of them, if it is planned from the start. We identify which trees stay before the demolition plan is drawn, fence off their root zones so equipment stays clear, and design the pier layout and the driveway around them. Some trees close to the old foundation or the new footprint may not survive construction regardless, and we tell you which ones honestly during site evaluation rather than after the fact. The canopy is usually why the lot was worth keeping.

Either path works. Some Memorial clients arrive with an architect and finished drawings, and we build to them and coordinate the engineering. Others start with us and we bring in design and engineering as part of the project, which keeps one team accountable from the first sketch through move-in. What matters more than who draws the plans is that they are complete before permit submittal, because the City of Houston and especially the Memorial Villages review incomplete sets slowly.

What Clients Say

Reputations are built over decades. Hear from the partners who have entrusted us with their most critical builds.

Porch Project
“We recently hired HPC to build our porch, and we could not be happier with the results. From start to finish, they went above and beyond expectations. Their attention to detail and commitment to quality really showed in every part of the work.”
Zoraida Cordoba
Bathroom Remodel
“He and his team did such a stellar job that I later hired him to help with a remodel of my guest bath. It’s a big and messy undertaking but Alfonso and team did it in a timely manner and with great communication... The customer service he provides really sets these guys apart.”
kara bowers
Outdoor Deck
“From start to finish he's been knowledgeable, patient, very humble and a down to earth guy. He also is realistic and works with clients to make their dreams a reality... I love my new elevated deck! If you're looking for a contractor that's not going to bail... HPC is the way to go!!”
Chasiti Latson
Discuss Your Project

Ready to Discuss
Your Project?

Whether you need a high-end residential remodel or a complex commercial buildout, our team is ready to plan and execute with the discipline your Houston-area project deserves.