What gets built first when the whole yard is a courtyard?
On a narrow West University lot the backyard is often a courtyard between the house, the garage, and two side fences, and there is no room to build one element now and figure out the rest later. Everything has to be planned as one layout even if it is built in phases. The cover comes first, because it sets the columns and the roof that the kitchen and lighting will sit under. The slab or paving is next, since it defines the level everything else sits on. The kitchen and any fire feature come last, and both are easier to add when their gas and electrical stubs were placed during the earlier phase.
Phasing this way lets the budget stretch across a year or two without redoing work. We draw the full plan on the first pass, price each phase separately on the free itemized quote, and put the conduit and gas stub for later phases in the ground while the trench is open. A client near Rice Village might build the cover and slab this fall and add the grill run next spring without a second trench through the side yard. The key is committing to the layout up front, because a cover designed without the kitchen in mind usually puts a column where the grill wants to go.