Does the HOA want the whole backyard plan or one structure at a time?
Most architectural committees in Spring's 1980s to 2000s subdivisions would rather see one drawing that shows the cover, the kitchen, the fire pit, and the hardscape together than three separate applications a year apart. A single master plan lets the committee judge the total footprint against the lot and the total roofline against the house once, and it lets you build in phases under an approval that already exists. Permitting runs through Harris County plus HOA review, and the county's part is limited to the structures that carry load or utilities. The committee, by contrast, will comment on paver color, fire pit height, and how visible the kitchen is from the neighbor's yard.
We assemble the HOA packet with a site plan drawn over the recorded plat, elevations for anything with a roof, and material samples, then hold the county filing until the approval letter arrives. Gleannloch Farms publishes its guidelines, and older sections near Old Town Spring often run on deed restrictions interpreted by a volunteer board, so the timing of a decision varies from one community to the next. Both windows together are usually a few weeks. Building without the letter is the expensive route, because a committee can require a finished structure to come out, and homeowners here who assumed a backyard was out of sight have learned that the hard way.