What does the HOA reviewer actually want to see?
Most Spring subdivisions, Gleannloch Farms among them, have an architectural control committee that reviews permanent backyard structures before a permit is pulled. What they want is usually predictable: a site plan showing the kitchen's footprint relative to lot lines and easements, elevations showing the height of any chimney or hood, and a materials list showing the masonry veneer matches or complements the house. We prepare that packet as part of design. The county side runs separately. Permitting runs through Harris County plus HOA review, and the county's interest is the gas line, the electrical circuit, and the structural adequacy of the masonry, not the color of the stone.
The order matters because an HOA rejection after a county permit is issued means a redesign and a second filing. So we submit to the HOA first, wait for the approval letter, then pull the county permit against the approved drawings. Homeowners in Spring sometimes assume the HOA step is a formality and start trenching. Deed restrictions in these 1980s to 2000s subdivisions are enforceable, and a committee can require an unapproved structure to be removed. A few weeks of review at the front end is cheaper than that. We build the review time into the schedule so the crew arrives with both approvals already in hand.










