Which comes first, the architectural review or the engineer?
In River Oaks the deed restrictions and the neighborhood's architectural review settle what an addition can be before any engineer sizes a beam. Setbacks, lot coverage, height, and how the massing presents from the street are all reviewed against your section's restrictions, and the answers differ from one street to the next. We read those restrictions first, sketch the addition within them, and only then bring the engineer in to produce the structural drawings. Doing it in the other order risks paying for engineering on a design the review will not accept, which is a mistake we have seen owners inherit from previous contractors.
The City of Houston permit runs on a parallel track. The city reviews the structural, mechanical, electrical, and plumbing drawings and inspects the work at each stage, and it does not care about brick color or window proportions. The neighborhood review cares about little else. We prepare one coordinated drawing set that satisfies both, submit the architectural package first because it takes the most back-and-forth, and file the city permit as soon as the design is accepted. Timelines for either review vary, and we build that into the schedule honestly rather than promising a start date the approvals cannot support.










