Phase one, phase two: what gets poured before anything else?
When the budget calls for building the backyard in stages, the order is decided by what is hardest to add later. Concrete comes first: the full slab footprint for the cover, the kitchen, and any seating area is poured in one phase even if the structures on it wait, because tying a new slab into an old one is the weakest joint in the yard. Gas, electrical, and water are trenched and stubbed at the same time, capped and inspected, so the second phase never has to open the ground. On a north-side lot with mature trees, that trenching is also the moment to route around roots.
The cover usually comes next, since it makes the patio usable through a Pasadena summer and it carries the fans and lighting that make evenings work. The outdoor kitchen follows when the utilities are already waiting under the slab, and a fire feature, seating walls, or planters finish the plan. Each phase is a separate line on the free itemized quote, priced as part of the whole, so you can see what phase one commits you to and what phase three adds. Building against a master drawing is what keeps the finished yard from looking like three unrelated projects.