Which piece gets built first when the whole backyard is the plan?
When a covered patio, an outdoor kitchen, a fire feature, and new hardscape are all on the wish list and the budget only covers part of it this year, the order matters. The cover goes first almost every time. It is the structure everything else depends on, it needs the engineered drawings and the City of Houston permit, and its footings and roof line decide where the kitchen and the seating will live. The slab and drainage go in with it. The kitchen comes second, because its gas and electrical lines can be stubbed in during the slab work and finished later without tearing anything up.
Fire features and finishing hardscape make sense as a later phase, since they sit at the edges and do not affect the structure. What does not work is building the small things first. A fire pit and a paver walk installed before the cover often end up in the path of a column footing or a utility trench, and they get torn out. We draw the full plan at the start even when only one phase is funded, and we run conduit and stub utilities for the later phases so each one drops in cleanly. On a generous Meyerland lot there is room for all of it, but only if the pieces are placed in the right order.