Which piece comes first when the whole plan is not in this year's budget?
Most Heights outdoor projects get built in phases, and the order matters because each piece depends on something buried under the last. The rule we follow is to design the whole yard once and build the underground work first. That means the slab, footings for a future cover, and sleeves for gas, water, and electrical conduit go in during the first phase even if the kitchen and the cover come two years later. Retrofitting a gas line under a finished patio on a narrow lot means cutting concrete along a side yard where there is no room to work around it.
With the groundwork done, the visible pieces can follow in the order you use them. A covered patio usually comes first, since shade is what makes a Houston backyard usable from May through October, and it gives the kitchen a roof to sit under later. The kitchen follows, then the fire feature and the finish hardscape. Each phase gets its own free itemized quote against the master plan, and the City of Houston permit for each is filed when that phase is ready rather than for a project that has not been funded yet.