Phase one, phase two: what to pour and wire now
Many Friendswood backyard projects start with a covered patio and grow into a kitchen and a fire feature over a few years. That works well if the first phase is built knowing the second is coming. The slab gets poured to the full final footprint, or at least with rebar dowels and a control joint where the next section will attach. Conduit for the future kitchen's electrical, a gas stub, and a water and drain line get placed under the concrete during phase one so nobody is cutting a finished patio later.
The roof structure follows the same rule. A cover built to the final size, with the electrical for future fans and lighting already in the ceiling, costs a little more up front and saves a second engineering, permit, and framing cycle later. We draw the whole plan first, then break the itemized quote into phases so you can see what each stage includes. Pouring and wiring for the future is usually the cheapest part of the whole project, and it is the part that cannot be added later without doing damage.