Teardown lot or vacant lot: what changes in site prep
On a teardown in one of Friendswood's established neighborhoods, the site work begins before the old house comes down. Utilities are located and disconnected, the mature trees to be kept are fenced off at the drip line, and the demolition plan keeps equipment off the root zones. After the structure is gone the old foundation comes out completely, because a new slab poured over remnants of the old one is a problem waiting to happen. The lot is then graded and the soil checked as if it were vacant ground.
A vacant lot is simpler on paper and still has its own questions. Fill that was placed decades ago may not be compacted, drainage from neighboring properties may cross the site, and a lot that has been empty on an old street sometimes has an easement or a utility line nobody mentioned. Either way we start with a survey, a soil report, and a topographic look at how water moves across the property, and we plan the driveway, the pad elevation, and the tree protection before the design is locked.










