Who signs off before the gas line goes in?
Cypress has no city building department, so the permits for the gas, water, and electrical runs go through Harris County, and the design itself goes through your community's MUD/HOA review. Those are separate tracks with separate reviewers. The county inspector cares whether the gas line is sized and tested correctly and whether the circuits are properly protected. The architectural committee in a section of Bridgeland or Fairfield cares where the structure sits, how tall it is, and what it looks like from the neighbor's yard. We submit both at the same time so neither one is waiting on the other, and we do not open a trench until both have cleared.
The rough-in inspection is the one that matters most. Gas, water, and electrical all get inspected while they are still exposed in the trench and inside the open framing of the island, before any block or stone covers them. If a line fails at that stage it is a small fix. If the problem is discovered after the masonry is up, the veneer comes off. We schedule the county inspection as its own line on the calendar and keep the masonry crew off the site until it passes. That single sequencing rule prevents most of the stories you hear about outdoor kitchens in newer Cypress subdivisions.