Which parts of the plan need covenant approval?
Anything a neighbor or the street can see is the working rule, and on most Woodlands lots that covers more than people expect. A covered patio changes the roofline the house presents to the side yard. An outdoor kitchen with a masonry back wall reads as a structure. A fire feature with a chimney is visible over most fences. The township is not an incorporated city, so there is no city hall in this process. The structural work is permitted through the county, and the community's design covenants review the exterior of what you build. Both reviews are the norm here from Grogan's Mill to Creekside Park, and the covenant side is the one that shapes the design.
We draw the full backyard plan before submitting anything, even if you only intend to build the first piece this year. A reviewer who sees the cover, the kitchen, and the fire feature together can evaluate the whole composition once, and the later phases do not come back as surprises that look bolted on. The drawings show materials, roof pitch, and how the new work relates to the house, since those are the points the design standards weigh most. County permitting for the roof structure and the gas and electrical runs proceeds on its own track. We manage both submittals and sequence them so the covenant response comes back before the slab crew is scheduled.










