Who has to sign the plan before the backyard changes?
In Cinco Ranch, Firethorne, Cane Island, and the rest of Katy's master-planned sections, the architectural review committee sees the drawings before any inspector does. They look at roof height and pitch on a cover, how close a structure comes to the fence, whether the kitchen's masonry matches the house, and what the neighbors will see over the fence line. City of Katy permits apply only inside city limits, and most of the greater Katy area is unincorporated, so the second layer of review is the county and the MUD rather than a city desk. Which combination applies to you is set by the address, not by the neighborhood name, and we confirm it before design work starts.
The practical effect is that the drawings do double duty. The same site plan that shows the HOA where the cover and kitchen sit is what the county or the city reviews for the structure, and the same engineer's stamp on the roof framing satisfies both. We draw the whole backyard plan once, even if you only intend to build the cover this year, because committees prefer to approve a complete picture rather than three separate submittals over three years. Gas lines, electrical runs, and any plumbing to a sink get their own inspections along the way. Expect the review step to take a few weeks and to be the part of the schedule we control least.










