Why the grading plan comes before any concrete
Most backyards in Atascocita and Fall Creek were finished by the builder with a small slab and a lawn graded just enough to pass, and the first heavy rain after a new patio goes in is when the drainage problems show. Water that sheds off a new cover has to go somewhere. If it lands on a slab pitched toward the house, it ends up at the foundation, and if it runs onto the neighbor's side, it becomes a dispute. We shoot grades across the yard before design and set the patio elevation and pitch so runoff moves away from the house and toward a proper outfall.
Older in-town Humble yards often have the opposite issue: decades of settling, a slab that has cracked and tilted, and lawn drains that were never installed. There we usually recommend replacing the old slab rather than extending it, since tying new concrete into a broken base carries the cracks forward. Where a pool is part of the plan, the deck drainage and the patio drainage are designed together so the two do not fight. The result is a hardscape plan with a drain path for every square foot, and it is priced before the outdoor kitchen or fire feature is even discussed.










