Which parts get poured and wired now if the kitchen comes later?
A phased backyard is the norm in Cinco Ranch, not the exception, and the plan only works if the first phase is built with the second in mind. If the cover comes first and the kitchen later, the slab under the future kitchen is poured to carry masonry, the gas and water lines are stubbed to that location and capped, and a conduit runs to the kitchen zone for the electrical it will need. If the kitchen comes first, the slab and footings for the future cover columns are placed and the ceiling height of the eventual cover is drawn so the grill's ventilation will work under it.
A fire feature is the easiest piece to defer, since a gas stub and a slab pad are all it needs from phase one. The hardscape is the hardest, because tearing out a patio to run a line later costs more than the line ever would have. We draw the complete vision on one plan, identify the elements that belong in phase one whether you use them yet or not, and price the phases separately in the quote. That way the yard you build this year is the first half of a finished design, not a finished project you have to cut into later.