Which piece goes in first when the budget comes in phases?
Most families build the backyard over two or three years, and the order decides how much gets torn up later. The slab and the underground work come first, always. Gas, water, drain, and electrical conduit get trenched and stubbed to where the kitchen and fire feature will eventually sit, then the concrete goes over them. The cover usually comes second because it makes the patio usable in a Houston summer and it establishes the footings the rest of the plan builds around. The kitchen and fire feature come last, on utilities that were waiting for them.
The larger lots in Channelview change the math a little. There is usually enough room to pour the full slab at the outset, including the future kitchen pad and the walkway to the yard, without crowding anything. That avoids a second concrete mobilization and a cold joint where the new pour meets the old. We draw the whole backyard as one plan, price each phase as its own section of the free itemized quote, and note which items, like conduit under the slab, are cheap now and expensive later so you can decide with that in front of you.