Phase one, phase two: what to pour first when the whole plan is not funded yet
Most Bellaire outdoor projects are a plan for the whole backyard built in stages, and the order matters more than the pace. Anything that goes under the concrete comes first, whether or not the thing it feeds is built this year: gas stubs for a future kitchen, conduit for lighting and fans, a drain line for a sink, and the footings for a cover. Pouring the slab without them means cutting it later. So the first phase is usually the slab and the cover, with the utilities sleeved and capped where the later pieces will land, and the kitchen or fire feature follows when the budget is ready.
The alternative order, kitchen first and cover later, works when the kitchen sits where a roof will never go, or when the cover is small enough to build around the masonry. It works less well when the cover's columns land where the island is planned. We draw the full plan at the start even if only part is being built, so each phase is priced as its own line on the free itemized quote and no phase paints the next one into a corner. On a ranch lot with room to spare, the plan can spread out. Behind one of the new two-story customs, the yard is smaller and the phases stack tighter.