Infill lot near the core or a new lot on the east side?
The two kinds of lots in Baytown build differently. An infill lot in an established neighborhood usually comes with a house to demolish or a long-empty site with old utilities, mature trees, and neighbors on both sides who have opinions about the new roofline. The site work includes demolition, capping and reconnecting utilities, protecting trees worth keeping, and designing a house that fits the scale of the block. A new lot in the development toward the east side of town is cleaner to start on, but it carries HOA architectural standards, a plat with defined building lines, and often a required set of exterior materials.
Before design starts we walk the lot with the survey in hand and look at drainage, the elevation of the street relative to the pad, where the utilities enter, and what the soil is doing. A soil boring is ordered early, because the foundation design depends on it and the foundation is the single largest structural decision in the house. Trees, easements, and the neighbor's drainage are all noted on the site plan that goes to the City of Baytown with the permit application, and the pad elevation is set so the house sits above the surrounding grade.










